Since Glenn's post got us talking about garages.....we're in the process of building a new house and since it is custom and not a spec house I was able to customize the garage a bit.
The third bay is vaulted and DirectLift sells a lift that a SuperDuty will fit under so in went plans to finally have a killer garage.
This weekend my friend Ken who is a painter primed and put the first coat of paint on, we're hoping to have it finished up for the most part next week. The lower section will be painted as close to Performance Red as I could find (I brought my stock fuel door to be color matched but the computer stated 'it requires too much color to match'. Then there will be a black stripe separating the red/gray.
The floor will be done with UCoatIt and I have a friend who owns a vinyl shop who is making my logo to embed before we put the final coat down.
It's still a bit disorganized in there, I did a bit more cleaning today after I took these but it won't get a final cleaning until after all the workers leave.
Vaulted ceiling (the two beams will be painted red) - excuse the haze, there was a lot of dirt I was sweeping up.
This gives a pretty good perspective - the ceiling on the right is 11' :
Door and opener :
The third bay is vaulted and DirectLift sells a lift that a SuperDuty will fit under so in went plans to finally have a killer garage.
This weekend my friend Ken who is a painter primed and put the first coat of paint on, we're hoping to have it finished up for the most part next week. The lower section will be painted as close to Performance Red as I could find (I brought my stock fuel door to be color matched but the computer stated 'it requires too much color to match'. Then there will be a black stripe separating the red/gray.
The floor will be done with UCoatIt and I have a friend who owns a vinyl shop who is making my logo to embed before we put the final coat down.
It's still a bit disorganized in there, I did a bit more cleaning today after I took these but it won't get a final cleaning until after all the workers leave.
Vaulted ceiling (the two beams will be painted red) - excuse the haze, there was a lot of dirt I was sweeping up.
This gives a pretty good perspective - the ceiling on the right is 11' :
Door and opener :